Structural Repair · Pinehurst · 2023

A 38-Foot Beam: Removing the Fireplace Wall in a 1983 Pinehurst Home

The living room of this 1983 Pinehurst home was built around a fireplace wall that cut it in two, with the kitchen closed off behind it and a sunroom on the far side that could not be seen from either. The owners wanted one room. Making that happen meant taking out walls that were holding up the ceiling and the roof above them. This is the structural part of the whole-home remodel.

Our structural engineer sized a 38-foot beam to carry that load and drew every post, beam and hanger on the plan before anything was cut. We opened the floor to set posts on new block piers in the crawl space, took out the fireplace wall and the kitchen walls, and set the beam with engineered hangers tying the existing framing into it. The ceiling was re-framed across the opening so the finished room reads as one ceiling, with no posts in the middle of the floor.

The result is a great room where the kitchen, the dining table and the living room share one space and one line of sight to the sunroom windows. The structure that makes it possible is out of sight, which is the point.

Town
Pinehurst
Completed
2023
Category
Structural & Repair
Details
38-foot engineered beam · Fireplace wall and kitchen walls removed · Posts on new block piers in the crawl space · Engineered hangers at every connection · Kitchen, dining and living room in one space
The finished project
The fireplace wall that divided the living room, stripped to its studs before it came out
Then Now

BeforeThe fireplace wall that divided the living room, stripped to its studs before it came out.

AfterOne room: the dining table, the bar and the kitchen beyond, with no post in the middle of the floor.

The build

Start to finish

The engineer's plan, with every new beam, post and hanger marked before framing started
The engineer's plan, with every new beam, post and hanger marked before framing started.
The new beam on dollies, rolled up the driveway on a plywood track
The new beam on dollies, rolled up the driveway on a plywood track.
The living room floor opened so the posts could go down to new piers
The living room floor opened so the posts could go down to new piers.
New block piers in the crawl space, under the posts that carry the beam
New block piers in the crawl space, under the posts that carry the beam.

After

One room where three used to be

From the kitchen to the fireplace. The wall that divided the house stood in this view
From the kitchen to the fireplace. The wall that divided the house stood in this view.
One room: the dining table, the bar and the kitchen beyond, with no post in the middle of the floor
One room: the dining table, the bar and the kitchen beyond, with no post in the middle of the floor.
The kitchen, now part of the room
The kitchen, now part of the room.
From the bedroom hall, straight through to the back windows
From the bedroom hall, straight through to the back windows.
The bar seating and the dining table along the window wall
The bar seating and the dining table along the window wall.
The fireplace kept its place at the end of the room
The fireplace kept its place at the end of the room.
The whole span from the living room corner
The whole span from the living room corner.

Watch

On site

Setting the 38-foot beam.

Scope

The work

Engineer first. A structural engineer sized the beam and located every post and hanger on the drawings before demolition.

Support from below. The floor was opened under the living room and new block piers were built in the crawl space where the posts bear.

Out with the walls. The fireplace wall and the kitchen walls were removed with temporary shoring carrying the load.

The beam and its hangers. A 38-foot beam set across the opening, the existing framing hung from it with engineered hangers, and the ceiling re-framed across the old wall lines.

How we got it approved

Client hired us to do pre-construction and design. Once the plan was approved by the client, we applied for permits as required and commenced with work.