Bathroom · Southern Pines · 2015

Historic Home Primary Suite in Downtown Southern Pines

This is the primary bedroom and bath in our own house, a historic two-family home in downtown Southern Pines. The bedroom floor was the first problem: original pine boards, worn through in places, cut for old pipes and patched with whatever was handy. The rest of the house is on the whole-house page.

We did not replace the floor. We pulled matching boards from elsewhere in the house, laced them into the old floor one at a time, and sanded and finished the whole room as one floor. A chimney ran up through the room behind plaster. We took the plaster off, cleaned the brick and mitered the floorboards around it.

The bath got a tiled shower built the way we build them for clients: backer board, a Schluter Kerdi membrane over the walls and the pan, then tile. Sliding barn doors close off the closet and the bath without a door swinging into the room.

Town
Southern Pines
Completed
2015
Category
Bathroom
Details
Original pine floor, patched with salvaged boards · Exposed brick chimney · Schluter Kerdi shower system · Black hex tile shower floor · Vintage cabinet as the vanity · Sliding barn doors
The finished project
The bedroom floor in 2015: worn boards, old patches and a hole
Then Now

BeforeThe bedroom floor in 2015: worn boards, old patches and a hole.

AfterThe bedroom, on the floor we patched and refinished.

The build

Start to finish

The bedroom floor in 2015: worn boards, old patches and a hole
The bedroom floor in 2015: worn boards, old patches and a hole.
Salvaged boards pulled and stacked for the patches
Salvaged boards pulled and stacked for the patches.
Laying out the repair
Laying out the repair.
New pieces laced into the old floor, board by board
New pieces laced into the old floor, board by board.

After

The finished suite

Sliding barn doors to the closet and the bath
Sliding barn doors to the closet and the bath.
The bedroom, on the floor we patched and refinished
The bedroom, on the floor we patched and refinished.
The chimney, exposed
The chimney, exposed.
Brick, plaster and old pine
Brick, plaster and old pine.
From the hall door
From the hall door.
The door to the window room off the bedroom
The door to the window room off the bedroom.
The bath through the barn door
The bath through the barn door.
A vintage cabinet as the vanity, under a granite top
A vintage cabinet as the vanity, under a granite top.
The shower: subway tile walls on a black hex floor
The shower: subway tile walls on a black hex floor.
Tile to the ceiling
Tile to the ceiling.

Scope

The work

Floor. Damaged boards cut out, salvaged pine boards laced in, the whole floor sanded and finished.

Chimney. Plaster removed, brick cleaned and left exposed from floor to ceiling, floorboards mitered around the base.

Closet. Wall opened and reframed for a closet behind a sliding door.

Shower. Backer board, Schluter Kerdi waterproofing on the walls and the pan, black hex tile floor, white subway tile walls.

Vanity. A vintage cabinet fitted with a granite top and an undermount sink.

How we got it approved

Client hired us to do pre-construction and design. Once the plan was approved by the client, we applied for permits as required and commenced with work.